Methodology

Latest Insights

Construction professional in a high-visibility jacket and a colleague reviewing large-format plans spread across a table
Methodology

Critical Path Method Scheduling and Why Delay Claims Depend on It

A late project is a claim, not evidence. Forensic schedule analysis under CPM shows whether a specific delay moved the completion date, who was responsible and whether it is excusable, compensable or both.

Read the article →
Construction inspector in a hard hat and safety vest reviewing notes on a clipboard inside a building
Methodology

Why ASTM Standards Matter in a Forensic Construction Investigation

A leak someone suspects and a leak documented under a named, repeatable test method are different things in a dispute. The ASTM standards behind envelope, waterproofing, coating and mold testing and why they carry weight.

Read the article →
Two people leaning over a set of architectural floor plans on a desk, both pointing at the same detail on the drawing
Methodology

No-Damages-for-Delay Clauses: Pricing the Risk and Building the Record

A no-damages-for-delay clause turns delay into a cost the contractor carries. Where agency and owner delays come from on real projects, how to price that exposure before signing and how to keep the project record every delay argument depends on.

Read the article →
Infographic comparing a raw invoice total against a defensible, code-and-contract-supported damage claim
Methodology

Quantum in Construction Claims: Valuing Damages Against Contract and Code

A damages figure built from invoices alone is a record of what happened. The harder, more defensible question is what should have happened under the contract and code. The analysis lives where the two diverge.

Read the article →
Have a Matter to Discuss?

Our team is ready to take a confidential look.

All submissions are held in strict confidence and reviewed within one business day.