Read the article →The right service when a building or a remodel is nearly done and you need the visible unfinished work documented in one list before final payment and turnover. For developers, owners and their project teams on commercial, multifamily, mixed-use and condominium buildings and for homeowners finishing a remodel.
Near completion, every party has its own list and nobody owns the whole picture. PCC walks the building room by room, records each item of visible incomplete work and workmanship with a photo and a location and gives you one register the contractor can work from. Every engagement starts with that walk and register; the other services below are added by agreement. PCC documents visible incomplete work and agreed completion concerns. Follow-up back-checks and warranty walks are available as additional services. Homeowners finishing a remodel get the same walk and register for their home.
A room-by-room register of visible incomplete work and workmanship, with a photo of each item, delivered in Excel and PDF.
An additional service: a return walk after the contractor's corrections, with each item marked addressed, partly addressed, not addressed or not accessible.
One register that merges the owner's, architect's and consultants' lists, so nothing is tracked twice or lost.
Warranties, O&M manuals, as-builts, attic stock and permits checked off for the owner's records, with a list of what is missing. Not an HOA turnover assessment.
An additional service for the owner or developer: visible concerns documented before the contractor's warranty period runs out, so they can be raised in time.
Every punch list is delivered as an Excel register and a PDF with photographs. Each row carries the same columns, so the contractor can sort by trade and the owner can see what is still open.
| No. | Area | Unit and room | Item | Photo | Trade | Status |
|---|---|---|---|---|---|---|
| 1 | Level 2 | Unit 204, kitchen | Sink base cabinet door out of alignment; uneven gap at the top edge | P-012 | Open | |
| 2 | Level 2 | Unit 204, bathroom | Sealant missing at the tub-to-wall joint, back corner | P-015 | Open | |
| 3 | Level 2 | Corridor | Paint touch-up needed beside the corner guard | P-021 | Open | |
| 4 | Level 1 | Lobby | Chipped floor tile at the threshold to the mail room | P-027 | Open | |
| 5 | Garage | Stall 18 | Wheel stop missing | P-033 | Open |
A punch list documents visible incomplete work and workmanship for the project team. It does not cover:
Our principal walks the building and prepares the register. He has carried multifamily developments from entitlement through construction and closeout and has run construction administration for architects, so he knows which items hold up a turnover and which are routine. On a larger building the walk is planned floor by floor around the contractor's work.
How a punch list engagement typically runs. This is an illustration, not a specific client project.
You do not need all of these to contact PCC.
Please wait for PCC's instructions before sending documents.
A list of incomplete or incorrect work found near the end of construction, so the contractor can finish it before final payment and turnover. PCC prepares it room by room, with a photo and a location for each item, in a format the contractor can work from.
The owner or developer and its contractor and architect. On a remodel, the homeowner and the contractor. It is a construction completion document for the project team. It is not an inspection report for unit buyers or the HOA and it is not prepared for a sale.
No. PCC lists visible incomplete work and workmanship. It does not review the work for code compliance, review the design or give engineering opinions. The building department decides code compliance. A buyer's inspection of a home is a different service with its own rules.
A back-check walk is a separately agreed add-on. PCC returns after the contractor has worked through the list and marks each item addressed, partly addressed, not addressed or not accessible. Items are never marked approved or certified. The updated register goes back to the owner and the contractor.
Commercial, multifamily, mixed-use and condominium buildings at construction completion, tenant improvement completion walks and homes at the end of a remodel. PCC works on site in Orange, Los Angeles and San Diego counties, the Inland Empire and the Coachella Valley; elsewhere in California by arrangement.
Contact PCC with the property location and your timing needs.
What the role covers, what drives its cost and how it differs from a construction manager.
Read the article →
How an owner-side adviser helps the repair money go to the repair it was meant for.
Read the article →
Why the project record kept during construction decides most delay arguments later.
Read the article →Tell us about the building or the remodel, the number of units and spaces and when the contractor expects to finish. We respond to inquiries within one business day.