For Developers, Owners, Project Teams & Homeowners

What PCC Does

Near completion, every party has its own list and nobody owns the whole picture. PCC walks the building room by room, records each item of visible incomplete work and workmanship with a photo and a location and gives you one register the contractor can work from. Every engagement starts with that walk and register; the other services below are added by agreement. PCC documents visible incomplete work and agreed completion concerns. Follow-up back-checks and warranty walks are available as additional services. Homeowners finishing a remodel get the same walk and register for their home.

Construction Punch List

A room-by-room register of visible incomplete work and workmanship, with a photo of each item, delivered in Excel and PDF.

Back-Check Walk

An additional service: a return walk after the contractor's corrections, with each item marked addressed, partly addressed, not addressed or not accessible.

Punch List Consolidation

One register that merges the owner's, architect's and consultants' lists, so nothing is tracked twice or lost.

Closeout Document Review

Warranties, O&M manuals, as-builts, attic stock and permits checked off for the owner's records, with a list of what is missing. Not an HOA turnover assessment.

11-Month Warranty Walk

An additional service for the owner or developer: visible concerns documented before the contractor's warranty period runs out, so they can be raised in time.

What You Receive

A Register the Contractor Can Work From

Every punch list is delivered as an Excel register and a PDF with photographs. Each row carries the same columns, so the contractor can sort by trade and the owner can see what is still open.

  1. 01Item number, unique across the project.
  2. 02Building area: the building, level or floor.
  3. 03Unit and room, using the names on the plans.
  4. 04Description of the visible condition.
  5. 05Photo number keyed to the item.
  6. 06Responsible trade, left blank for the contractor to assign.
  7. 07Status for the back-check walk.
Illustrative sample · not a client register
Register excerpt. Visible incomplete work and workmanship only; not a code, plan or engineering review.
No.AreaUnit and roomItemPhotoTradeStatus
1Level 2Unit 204, kitchenSink base cabinet door out of alignment; uneven gap at the top edgeP-012 Open
2Level 2Unit 204, bathroomSealant missing at the tub-to-wall joint, back cornerP-015 Open
3Level 2CorridorPaint touch-up needed beside the corner guardP-021 Open
4Level 1LobbyChipped floor tile at the threshold to the mail roomP-027 Open
5GarageStall 18Wheel stop missingP-033 Open
Status at the back-check walk: Addressed · Partly Addressed · Not Addressed · Not AccessibleExcel and PDF
Before You Call

What to Gather Before You Call

You do not need all of these to contact PCC.

Please wait for PCC's instructions before sending documents.

  • Building type
  • Number of units and spaces
  • The contractor's completion date
  • Any lists already started
  • The site access contact
How It Works

How a Punch List Engagement Starts

  1. First call: the building, the number of units and spaces, the schedule and who is on the project team.
  2. Documents, once PCC asks for them: the plans, the contractor's schedule and any lists already started.
  3. Scope in writing: the areas to walk and any add-ons such as a back-check walk, agreed before work begins.
  4. The walk: room by room, with site access arranged through the contractor.
  5. Register: the Excel register and PDF, then an updated register after a back-check walk when one is added.
Frequently Asked

Punch Lists & Closeout: Quick Answers

What is a construction punch list?

A list of incomplete or incorrect work found near the end of construction, so the contractor can finish it before final payment and turnover. PCC prepares it room by room, with a photo and a location for each item, in a format the contractor can work from.

Who uses PCC's punch list?

The owner or developer and its contractor and architect. On a remodel, the homeowner and the contractor. It is a construction completion document for the project team. It is not an inspection report for unit buyers or the HOA and it is not prepared for a sale.

Is a punch list the same as a code inspection or a home inspection?

No. PCC lists visible incomplete work and workmanship. It does not review the work for code compliance, review the design or give engineering opinions. The building department decides code compliance. A buyer's inspection of a home is a different service with its own rules.

What happens at the back-check walk?

A back-check walk is a separately agreed add-on. PCC returns after the contractor has worked through the list and marks each item addressed, partly addressed, not addressed or not accessible. Items are never marked approved or certified. The updated register goes back to the owner and the contractor.

What kinds of projects does PCC prepare punch lists for?

Commercial, multifamily, mixed-use and condominium buildings at construction completion, tenant improvement completion walks and homes at the end of a remodel. PCC works on site in Orange, Los Angeles and San Diego counties, the Inland Empire and the Coachella Valley; elsewhere in California by arrangement.

How soon can you visit?

Contact PCC with the property location and your timing needs.

From PCC Insights

Related Reading

Surveyor with equipment overseeing excavation work on a job site
Construction Management

What an Owner's Representative Actually Does During a Rebuild

What the role covers, what drives its cost and how it differs from a construction manager.

Read the article →
Construction crew framing and installing drywall during interior remodel work
Construction Management

Post-Settlement Construction Management: What Happens After the Case Closes

How an owner-side adviser helps the repair money go to the repair it was meant for.

Read the article →
Two people leaning over a set of architectural floor plans on a desk, both pointing at the same detail on the drawing
Methodology

No-Damages-for-Delay Clauses: Pricing the Risk and Building the Record

Why the project record kept during construction decides most delay arguments later.

Read the article →
Punch Lists & Closeout

Building nearly finished?

Tell us about the building or the remodel, the number of units and spaces and when the contractor expects to finish. We respond to inquiries within one business day.