Site observation gives you a dated, written record of what was visible on site on the day of each visit. PCC observes, photographs and reports. Your contractor runs the work and you decide what to do with what the report shows.
One concern or location observed and photographed, with a short report that also states what was not determined.
Periodic visits recording visible progress against the owner's schedule, with a time-stamped photo log before work is covered.
A dated photo and written record of visible conditions before work starts or before a question becomes a dispute.
A photo and video record of adjacent buildings before excavation or demolition, repeated afterward. No vibration or movement monitoring.
A dated condition record of a commercial space at the start of a lease, with restoration items noted at move-out.
A record of visible storm, fire, water or earthquake damage. Questions of cause move to a defect investigation or, for structural damage, to a licensed engineer.
Each report follows the same structure and carries a title for the assignment, such as Site Observation Report: Existing Conditions or Site Observation Report: Renovation Progress.
Site observation is a visual record, not supervision. It does not cover:
Our principal makes the visits and writes the reports. He has handled construction administration for architects on multifamily work and was senior project manager and construction manager on the team delivering a major airport terminal program. He has also served as project manager on public university capital projects, so he knows what to record on each visit and what an owner needs to see in a report.
How a site observation engagement typically runs. This is an illustration, not a specific client project.
You do not need all of these to contact PCC.
Please wait for PCC's instructions before sending documents.
Periodic visits to a construction site to see and record the visible condition and progress of the work, with a written report after each visit. It is not continuous supervision: PCC visits at set times and reports what it saw on those days.
No. PCC records visible conditions and progress and suggests next steps. It does not approve the work, certify code compliance or perform special inspections. The building department and the project's special inspectors keep those roles.
That depends on the project. Common patterns are a visit every week or two during active work and visits timed to stages such as foundation, framing, waterproofing and closeout. The schedule is agreed in writing and can change as the project moves.
The client who retains PCC. On home renovation work PCC sends reports to the owner only. The owner decides whether to share them with the contractor or a lender.
Yes. A pre-construction condition survey records adjacent buildings with dated photographs and video before excavation or demolition, then again afterward. PCC does not monitor vibration or movement; a monitoring firm does that.
Tell us first. Under California law a review of a home of one to four units connected to its sale is treated as a home inspection, so it is handled under a separate agreement and scope. Buyers can see PCC's flipped and renovated home inspection service.
Yes. PCC works directly with homeowners on construction-defect and water-intrusion investigations, site observations and renovation advisory assignments. For dispute-related work, your attorney may also retain PCC.
Contact PCC with the property location and your timing needs.
Why a dated record made early is worth more than one made after repairs.
Read the article →
What the role covers, what drives its cost and how it differs from a construction manager.
Read the article →
How the rebuild rules differ and where an owner-side adviser fits.
Read the article →Tell us where the site is, what stage the work is at and what you need recorded. We respond to inquiries within one business day.