Common Questions

Frequently Asked Questions

Does a CGL policy cover the cost to fix a contractor's own defective work?

Policy wording and endorsements decide that and counsel applies them. CGL policies contain exclusions aimed at the cost of redoing the insured's own work, while physical injury to other property can be treated differently. On the construction side, the repair estimate has to show which lines replace defective work and which repair physical damage to other components, with the evidence for each. Without that split, nobody can apply the policy to the number.

What is the difference between defective work and resulting damage in construction?

Defective work is a condition: something not built to the contract documents, the manufacturer's instructions or accepted practice, such as a window without proper flashing integration. Resulting damage is physical injury that condition caused to something else, such as decayed framing, corroded fasteners or deteriorated drywall. The expert shows the defect by comparing the as-built condition to the documents. The damage is shown through moisture readings, probing, photographs and a clear link to the defect location.

How are rip-and-tear or access costs handled in a construction defect repair estimate?

Price them as their own category. Access is sound work removed only to reach defective work or damaged components, such as stucco cut back to rebuild window flashing. For each access item the estimate should state what it is being removed to reach. Where one cut serves both the defect and the resulting damage, say so and state how the cost is split. Repair method choices drive access quantities, so each one needs a technical basis.

How do experts determine when construction defect damage started?

They bracket it. Installation dates from pay applications, daily reports, inspection cards and construction photos set the earliest possible date. First complaints and work orders show when damage became visible. Weather history, prior repairs and the extent of decay, corrosion and moisture fill in the middle. An expert can usually show damage was progressive between those points but rarely can fix a precise start date or split damage exactly by policy year.

What should be photographed before demolition on a construction defect claim?

Photograph each cost category before anything comes out. Get the defective condition with a scale reference and the resulting damage with moisture readings in frame, plus a wider shot tying it to the defect. Shoot the sound material that will come off only for access and the existing conditions that code upgrades or betterment will change. Tie each photo to a marked-up elevation and keep the original files with metadata intact, not PDFs of photos.

How are code upgrades and betterment separated in a repair estimate?

Code upgrades are items the building department will require on the repair permit that the original construction did not include. The expert documents the original code cycle, identifies each new requirement and prices it as its own line. Betterment is any improvement beyond like-kind repair, such as an upgraded window series or an added rainscreen. Price it as the difference over like-kind so the parties can decide who pays for it.

Related Reading

Continue Exploring

Infographic comparing a raw invoice total against a defensible, code-and-contract-supported damage claim
Methodology

Quantum in Construction Claims: Valuing Damages Against Contract and Code

A damages figure built from invoices alone is a record of what happened. The harder, more defensible question is what should have happened under the contract and code. The analysis lives where the two diverge.

Read the article →
Diagram comparing visible patent defects (4-year limitations period) against hidden latent defects (10-year limitations period)
State Guides

Patent vs. Latent Defects: What a Reasonable Inspection Would Reveal

A patent defect is one a reasonable inspection would reveal. A latent defect is one it would not. In California that line separates the four-year limit in CCP 337.1 from the ten-year limit in CCP 337.15. How a forensic investigator documents what could be seen and when.

Read the article →
Construction inspection team examining a building threshold with a moisture meter
Services

Construction Forensics & Expert Witness Services

How a forensics engagement runs, from intake and conflict check through deposition and trial support.

View the service →
Ready When You Are

Need a repair estimate the policy can actually be applied to?

All submissions are held in strict confidence and reviewed within one business day.